AQA GCSE Mathematics Paper 2 (Higher), June 2025: Question 3
5 marks · Medium difficulty · Multi-step Problem
Draw a time series graph representing advert views over 6 days and estimate the earnings on day 7 given a rate per view in pence.
Practise this questionQuestion
Mark scheme
Show the mark scheme
How to answer it
Time Series Graphs & Real-World Money Calculations
📋 What this question tests
- Graph plotting: Accurately plotting points on a grid with non-unit scales (each small square on the vertical axis represents 1 000 units).
- Time series conventions: Joining consecutive plotted points with straight ruled line segments (point-to-point).
- Trend extrapolation: Continuing a downward trend to make a sensible, realistic estimate for a future value (Day 7).
- Multi-step money calculations: Multiplying large quantities by fractional pence values ( 0.018p ) and converting pence to pounds ( ÷ 100 ).
Part (a) — 2 Marks
Drawing the Time Series Graph
Plotting 6 days of advert views and connecting them
✅ Mark Scheme Breakdown
- B2: All 6 points plotted correctly (within ± half a small square) and joined sequentially with ruled straight lines.
- B1 (partial): At least 4 points plotted correctly, or all 6 points correctly plotted but not joined.
Points to plot:
(1, 49 000), (2, 95 000), (3, 87 000),
(4, 77 000), (5, 64 000), (6, 48 000)
(1, 49 000), (2, 95 000), (3, 87 000),
(4, 77 000), (5, 64 000), (6, 48 000)
💡 Reading the Vertical Scale
Examine the vertical axis closely:
- 1 large square = 10 000 views.
- There are 10 small squares per 10 000 views.
- Therefore, 1 small square = 1 000 views.
- Example: Day 1 is 49 000, which is exactly 1 small square below 50 000.
- Example: Day 2 is 95 000, which is exactly halfway (5 small squares) between 90 000 and 100 000.
🧠 Exam Technique for Time Series
- Use a ruler: Time series graphs must be joined with straight line segments from point to point, not a single curved line of best fit.
- Do NOT extend: Stop your line exactly at Day 6. Do not draw lines before Day 1 or beyond Day 6 unless explicitly asked.
- Use small crosses: Plot using neat × marks rather than large blobs so your accuracy is clearly within half a small square.
❌ Common Errors to Avoid
- Drawing a single line of best fit: A line of best fit across all points is incorrect for a time series and loses the joining mark.
- Misreading the scale: Plotting 49 000 at 40 900 or miscounting squares around 95 000.
- Curving the joins: Sketching a smooth curve through the points instead of using a sharp pencil and ruler for straight segments.
Part (b) — 3 Marks
Estimating Day 7 Earnings
Extrapolating views and calculating earnings in pounds (£)
📐 Step-by-Step Calculation
Step 1: Estimate views on Day 7 from the trend
Looking at Days 2 to 6, views fall steadily:
• Day 2 → 3: drop of 8 000
• Day 3 → 4: drop of 10 000
• Day 4 → 5: drop of 13 000
• Day 5 → 6: drop of 16 000
Continuing this downward slope suggests views on Day 7 will lie between 20 000 and 40 000 (e.g., around 30 000 to 35 000).
[B1 awarded for any estimate in the range 20 000 to 40 000]
Looking at Days 2 to 6, views fall steadily:
• Day 2 → 3: drop of 8 000
• Day 3 → 4: drop of 10 000
• Day 4 → 5: drop of 13 000
• Day 5 → 6: drop of 16 000
Continuing this downward slope suggests views on Day 7 will lie between 20 000 and 40 000 (e.g., around 30 000 to 35 000).
[B1 awarded for any estimate in the range 20 000 to 40 000]
Step 2: Multiply by rate per view (in pence)
Suppose your estimate is 32 000 views:
32 000 × 0.018p = 576p
[M1 awarded for (their views) × 0.018 ÷ 100 or equivalent]
Suppose your estimate is 32 000 views:
32 000 × 0.018p = 576p
[M1 awarded for (their views) × 0.018 ÷ 100 or equivalent]
Step 3: Convert pence into pounds (£)
The answer line has a £ sign, so divide pence by 100:
576p ÷ 100 = £5.76
[A1ft awarded for correct calculation and money format, within £3.60 to £7.20]
The answer line has a £ sign, so divide pence by 100:
576p ÷ 100 = £5.76
[A1ft awarded for correct calculation and money format, within £3.60 to £7.20]
✅ Mark Scheme Tolerances
- B1: Day 7 views estimated between 20 000 and 40 000 (can be implied in working).
- M1: their views × 0.018 ÷ 100 or their views × 0.00018 .
- A1ft: Correct final value in range £3.60 to £7.20 . Truncated or rounded to 2 decimal places (nearest penny).
❌ Major Calculation Traps
- The "0.018" unit confusion: 0.018 is in pence, not pounds! Multiplying 30 000 × 0.018 gives 540p (£5.40). Writing £540 loses the final mark.
- Premature rounding of the rate: Rounding 0.018p up to 0.02p is condoned for method (M1), but caps the marks at 2 out of 3 (cannot score the final A1 mark).
- Unrealistic Day 7 estimate: Choosing a number outside [20 000, 40 000] (such as guessing 50 000) loses the B1 mark, though follow-through M1 can still be recovered.
- Missing decimals on money: If your answer is £5.4, always write it properly as money: £5.40 .
🎓 Examiner Tips for Top Marks
- Always state your Day 7 figure clearly: Even if you do the whole calculation on your calculator, write down: "Day 7 estimate = 30 000". That guarantees the B1 mark instantly.
- Unit check: Always look at the unit given on the answer line. If it has a £ sign, ask yourself: "Did I convert from pence?"
- Sensible check: If an advert gets around 30 000 views at a tiny fraction of a penny per view, earning roughly £5 to £6 sounds completely realistic!
Topics
Statistics · Number · 3.6 Statistics · 3.1.3 Measures and accuracy
Question and mark scheme from the AQA GCSE Mathematics examination, Paper 2 (Higher), June 2025. QuestionVault is an independent revision resource; questions remain the copyright of the awarding body.